The intelligent management of power in electrical utilities depends on the high significance of load forecasting models.Since the industries are digitalized, power generation is supported by a variety of resources.Therefore, the forecasting accuracy of different models varies.The power utilities with different generation modalities (DGM) experience
Echocardiographic evaluation of working dogs of the Military Police of Rio de Janeiro: effects of the breed and body weight
The Military Police of Rio de Janeiro state use dogs as a decisive tool for patrol and detection of drugs, weapons, and explosives.Complementary tests, such as echocardiography, are essential to maintain the integrity of these animals.This study aimed to evaluate cream paste the echocardiographic parameters of the working dogs belonging to the Mili
Tradisi Reresik Sendang Masyarakat Wonosoco dalam Perspektif Ekoteologi Islam
This study aims to determine the perspective Bag of Islamic eco-theology in the Reresik Sendang tradition in Wonosoco Village.How the people of Wonosoco Village carry out, interpret, and how the Reresik Sendang tradition is seen from the perspective of Islamic eco-theology.This research uses a type of field research using a qualitative descriptive
Model-Based Dynamic Performance Simulation of a Microturbine Using Flight Test Data
Microturbines can be used not only in models and education but also to propel UAVs.However, their wider adoption is limited by their relatively low efficiency and durability.Validated simulation models Wellington Socks are required to monitor their performance, improve their lifetime, and to design engine control systems.This study aims at developi
Strengthening, rehabilitation and widening of the existing arch bridge on national route 7 over the Olifants River, South Africa
This paper describes the rehabilitation of the existing bridge over the Olifants River.The bridge is on National Route 7 near Klawer and dates back to 1957.The defining feature of this elegant bridge is a concrete arch spanning 92.7 m.The existing bridge Grooming Kits displayed extensive cracking, failed expansion joints and spall damage to beam so